Outdoor family / Elevation, grazing and outline
Facade & Linear Lighting
Define the surface, mounting position, setback, beam control and control intent before comparing facade or linear lighting candidates.
Capability or requirement is discussed at project level before any model, finish or document claim is published.

Application frame
Define where the light works before naming a product.
The application list is a briefing aid. Each installation still needs its own geometry, environment, controls and evidence requirements.
- 01Facade washing
- 02Wall grazing
- 03Architectural outlines
- 04Canopy and bridge accents
Reviewed product cards
Public models appear only after review.
No unverified legacy model is converted into a public product claim.
Current publication state / 0 reviewed models
No reviewed product cards are published in this family yet.
Send the project conditions and required evidence. Candidate models can then be named, checked and recorded in the RFQ scope.
Start a contextual RFQGCC environment checklist
Make the operating conditions part of the shortlist.
Suitability is determined for the exact model and installation—not inferred from a family label.
- Maximum ambient temperature and operating schedule
- Dust, sand, water, drainage and cleaning conditions
- Coastal exposure and corrosion requirement
- Mounting, access and maintenance constraints
- Voltage, surge protection and control requirement
- Optical, calculation and project-approval criteria
Evidence boundary
Family context is not model proof.
This family page defines procurement scope only. Model identity, photometric files, environmental ratings, documents and availability remain unverified until reviewed for the RFQ.
FAQ / evidence boundary
Facade & Linear Lighting qualification FAQ
These answers separate public evidence from the configuration and file checks completed for a live project.
Are facade models already reviewed?
No reviewed model cards are published in this family yet. A candidate is assessed only after its exact model, optics, mounting and file scope are named.
What should a facade RFQ include?
Send elevations, surface material, mounting detail, setback, target effect, control intent, environmental exposure and required photometric or approval files.